Simulation vs. Formal Verification - cont’d

Simulation vs. Formal Verification - cont’d

  • Simulation
    • CPU intensive
      • have to run billions of cycles
    • Can handle large systems

  • Formal Verification
    • Most of the state-of-the-art methods are memory intensive
      • Intenal data structures (BDD)
    • Memory usage is strongly related with the size of systems to be verified

Previous slide Next slide Back to the first slide View Graphic Version

Contact 
©2002-2018 U.C. Regents